sentry

Situation

NAI Robert Lynn was engaged to assist Utex Industries with their rapid and exponential growth.  Their real estate requirement was challenging.  They needed a +/- 100,000-130,000 square foot manufacturing facility with heavy power in excess of 4,000 amps (480 Volt), existing overhead bridge cranes, outside storage, and needed the entire warehouse area to be 100% HVAC.  Utex also wanted to remain in the Mansfield submarket which limited their options. Due to customer requirements, they needed the new facility ASAP.

Share this Case Study

Size

35,182Square Feet

Result

NAI highlighted the unique characteristics of the facility that included cranes, paint booth, sand blast area, heavy power, and outside storage.  Through highlighting those aspects of the property, NAI was able to garner interest from a number of tenants that required those building features for their operation. Ultimately, AFT was expanding and required virtually all of the infrastructure currently in place.  NAI was able to negotiate a long-term lease agreement with an established tenant.